What We Do

Services

Here's everything we build, fix, and maintain, from the footings up.

Home › Services

Everything we take on

Every job below is one we do ourselves across Racine.

Deck Installation

We frame new decks on footings poured below Wisconsin's 42-inch frost line, so the structure doesn't heave when the ground freezes and thaws. Joists go in at 16 inches on center, hung with galvanized or stainless hangers depending on the lumber you choose. You get a ledger board properly flashed against the house, not just lagged through the siding.

Deck Repair

Loose railings, bouncy joists, and rotted ledger boards are the three calls we get most. We pull the deck boards to check the frame underneath before replacing anything on top, because a new board over a soft joist just fails again in a year. A snapped stair stringer or a popped post base usually gets fixed in a single visit.

Deck Staining & Sealing

Pressure-treated and cedar decks need a fresh coat of stain every two to three years or the wood grays, checks, and starts absorbing water at the end grain. We power wash at low pressure to avoid fuzzing the fibers, let the wood dry for a couple of days, then apply a penetrating stain instead of a film-forming one that peels. Composite decking skips this step entirely, which is one reason people switch.

Custom Deck Design

Multi-level decks, built-in bench seating, skirting to hide the crawlspace underneath, we draw it out before anyone picks up a saw. We'll tell you if a design idea fights against your lot's grade or your local setback rules. Stairs, rail style, and board pattern all get decided on paper first.

Composite Decking Installation

Composite boards cost more up front than pressure-treated lumber, but there's no sanding or staining, and most carry a 25-year fade warranty. The framing underneath still needs to be real lumber spaced correctly, composite doesn't fix bad joists. We install hidden fastener systems so the top surface stays clean, with no screw heads showing.

Deck Railing Installation & Repair

Wisconsin code calls for guardrails at 36 inches on most residential decks, with baluster gaps under 4 inches so a kid's head can't fit through. We replace wobbly posts by bolting through the rim joist with structural screws instead of toe-nailing, which is why most old railings fail in the first place. Cable rail and glass panel options are available if you want the view unobstructed.

Deck Resurfacing

If your frame is still solid but the decking boards are cupped, splintering, or gray, we strip the old boards and lay new decking over the existing structure. This costs a fraction of a full rebuild and takes a couple of days instead of a couple of weeks. We check every joist for rot while the old boards are off, before anything new goes down.

Screened-In Deck Additions

We build screened porches off the back of the house using the same footing and framing approach as an open deck, then frame in a roof and screen panels. It keeps mosquitoes and wasps out all summer without sealing the space up like a sunroom. Roof tie-in and flashing against the house is the part that separates a dry porch from one that leaks.

Deck Demolition & Removal

Old decks get torn out board by board, posts pulled, footings broken out or left in place if you're building over the same footprint. We haul everything away, so you don't need a dumpster sitting in your driveway for two weeks.

Pergolas & Covered Decks

A pergola gives you shade and structure without a full roof, good for a deck that gets afternoon sun all summer. Covered decks tie into the house roofline and need proper flashing where the new roof meets the old one, or you're just building yourself a leak. Either option can be added to a deck we built or one that's already there.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Racine, WI

Deck crews travel to every town on this list on a regular basis.

Racine, WI
Milwaukee, WI
Kenosha, WI
Waukesha, WI
Franklin, WI
Oak Creek, WI
Mount Pleasant, WI
Caledonia, WI
Pleasant Prairie, WI
Burlington, WI
Sturtevant, WI
Union Grove, WI
Common Questions

Things worth asking

Questions that come up once a project is actually underway.

Do I need a permit to build a deck?
Most elevated decks in Wisconsin require a building permit, and decks over 30 inches off the ground usually need engineered guardrails as part of that approval. A ground-level deck under a certain height may be exempt depending on the local municipality's code.
How long does it take to build a deck?
A standard 300 to 400 square foot deck usually takes one to two weeks from the first footing to the final board, weather permitting. Multi-level designs, screened porches, or composite decking with hidden fasteners add extra days to that timeline.
Can you build a deck within a specific budget?
Deck size, decking material, and railing style can all be adjusted to hit a target budget, and a contractor should walk through those trade-offs before the quote is finalized. Pressure-treated lumber with standard railings is the lowest-cost route, composite and cable rail push the number up.
Do you guarantee your deck work?
Workmanship on new deck construction and repairs is typically covered for a set period after completion, spelled out in writing in the quote. Manufactured materials like composite decking carry their own separate warranty from the manufacturer, often running 20 to 25 years against fading and staining.
Who will I be dealing with during the project?
A single point of contact, usually the crew lead on site, handles day-to-day questions once a deck project starts. That keeps communication from getting lost between an office and the crew actually swinging hammers.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite decking from major manufacturers are the three most common choices for deck projects in this area. Pressure-treated costs the least upfront, cedar has a natural look but takes more upkeep, and composite costs more but skips the staining.
Can I still use my yard while the deck is being built?
Part of the yard near the build site stays off-limits while footings are being dug and framing is underway, mainly for safety around open holes and power tools. Most of the rest of the property and the house itself stay fully usable during a deck build.
How should I prepare my yard before deck construction starts?
Clearing patio furniture, grills, and potted plants away from the build area makes the first day move faster. Calling 811 to mark buried utility lines happens before footings are dug, and that step is handled as part of scheduling the job.
What happens if you find rot or a problem once the old deck is torn off?
Hidden rot in a ledger board or support post sometimes only shows up once the old decking is pulled off, since it hides under boards until then. Any additional repair gets priced and approved before work continues, rather than getting buried into the final invoice as a surprise.
How do I maintain a new deck once it's finished?
Pressure-treated and cedar decks need re-staining every two to three years, with a power wash and inspection for loose fasteners each spring. Composite decking just gets an occasional soap and water wash since it doesn't absorb water or require sealing.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (414) 895-6620